I often stand & marvel at deals of engineering.

Some seemingly small ones, like ultra strong toughened glass that is used as flooring in some shopping centres & towers etc are completely taken for granted, yet I still wonder at man's ingenuity in creating them.

Then you have the more spectacular ones, skyscrapers that quite literally dominate the horizons of cities, cruise liners that are the size of a small town, massive suspension bridges etc.

Sadly I feel that the UK used to lead the world in this field, but no longer seems to innovate or invest in these ground breaking & outstanding achievements.

However, the reason behind my posting this now is that I have just seen, on television, this incredible feat of engineering for the first time.

ejyqe4ut.jpg


Its called the Falkirk Wheel.

It connects two canals that are separated by over 110 feet of air!

I'll copy & paste the details of it & how it works.

The Millennium Link was an ambitious £84.5m project with the objective of restoring navigability across Scotland on the historic Forth & Clyde and Union Canals, providing a corridor of regenerative activity through central Scotland.

A major challenge faced, was to link the Forth and Clyde Canal, which lay 35m (115ft) below the level of the Union Canal. Historically, the two canals had been joined at Falkirk by a flight of 11 locks that stepped down across a distance of 1.5km, but these were dismantled in 1933, breaking the link.

What was required was a method of connecting these two canals by way of a boat lift. British Waterways (nowScottish Canals) were keen to present a visionary solution taking full advantage of the opportunity to create a truly spectacular and fitting structure that would suitably commemorate the Millennium and act as an iconic symbol for years to come.



The various parts of The Falkirk Wheel were actually constructed and assembled, like one giant Meccano set, at Butterley Engineering's Steelworks in Derbyshire. A team there carefully assembled the 1,200 tonnes of steel, painstakingly fitting the pieces together to an accuracy of just 10 mm to ensure a perfect final fit.

In the summer of 2001, the structure was then dismantled and transported on 35 lorry loads to Falkirk, before all being bolted back together again on the ground, and finally lifted by crane in five large sections into position. The total 600 tonne weight of the water and boat filled gondolas imposes immense and constantly changing stresses on the structure as it turns around the central spine. Normal welded joints of steel would be susceptible to fatigue induced by these stresses, so to make the structure more robust, the steel sections were bolted together. Over 15,000 bolts were matched with 45,000 bolt holes, and each bolt was hand tightened.

Falkirk Wheel lies at the end of a reinforced concrete aqueduct that connects, via the Roughcastle tunnel and a double staircase lock, to the Union Canal. Boats entering the Wheel's upper gondola are lowered, along with the water that they float in, to the basin below. At the same time, an equal weight rises up, lifted in the other gondola.

This works on the Archimedes principle of displacement. That is, the mass of the boat sailing into the gondola will displace an exactly proportional volume of water so that the final combination of 'boat plus water' balances the original total mass.

Each gondola runs on small wheels that fit into a single curved rail fixed on the inner edge of the opening on each arm. In theory, this should be sufficient to ensure that they always remain horizontal, but any friction or sudden movement could cause the gondola to stick or tilt. To ensure that this could never happen and that the water and boats always remain perfectly level throughout the whole cycle, a series of linked cogs acts as a back up.

Hidden at each end, behind the arm nearest the aqueduct, are two 8m diameter cogs to which one end of each gondola is attached. A third, exactly equivalent sized cog is in the centre, attached to the main fixed upright. Two smaller cogs are fitted in the spaces between, with each cog having teeth that fit into the adjacent cog and push against each other, turning around the one fixed central one. The two gondolas, being attached to the outer cogs, will therefore turn at precisely the same speed, but in the opposite direction to the Wheel.

Given the precise balancing of the gondolas and this simple but clever system of cogs, a very small amount of energy is actually then required to turn the Wheel. In fact, it is a group of ten hydraulic motors located within the central spine that provide the small amount, just 1.5kWh, of electricity to turn it.
 